top of page

HOW TO MAKE NON-ASBESTOS CORRUGATED ROOFING SHEET

  • Writer: Haley Dang
    Haley Dang
  • Nov 6, 2020
  • 3 min read

Non-asbestos corrugated roofing sheet was made from cement, paper pulp, PVA fiber and other inorganic additives. Just with some simple raw materials but it is not easy to make good final sheet that requests exactly in proportion of raw materials, slurry and all process. So, how to make non-asbestos corrugated roofing sheet well?

To get the good final sheet, it has to go through eight basic stages.




Stage 1: Preparing raw material

Preparing materials in accordance with the ratio. PVA fiber (1 – 2 wt%), paper pulp (2 – 5 wt%), inorganic additives (5 – 10 wt%), cement (balance).


Stage 2: Pulp preparation

The first stage of the production is pulp preparation. Crushing kraft paper with water proportionally to convert to slurry.


Stage 3: PVA fiber preparation

After being pre-mixer, PVA fibers are fed into high-speed air stream to further separate single fibers to avoid clumping when mixed with the slurry. Then, the PVA fibers continue to be passed through pneumatic piping system and into the de-pressurizing chamber and then dropped into the vertical hydraulic mixer and dispersed into the slurry mix.


Stage 4: Two – component slurry preparation

Slurry - a component that is pumped quantitatively into the hydraulic vertical mixer. Here, water and cement are supplied quantitatively to create a two-component slurry. In this stage, the prepared additives silica fume and bentonite are also added according to the required material.


Stage 5: Three – component slurry preparation

Adding PVA to the two-component slurry to create a three-component slurry. After the homogeneity of the three-component slurry has been achieved, they are discharged into the turbo-mixer to continue mixing with the necessary additive components.


Stage 6: Green sheet forming process

The green sheet forming process is started from the rotary distributing mixer. Slurry mixture consists of paper pulp, PVA fiber, cement and together with a small percentage of additives to increase forming. All of this mixture is stored in the rotary distributing mixer to avoid any setting taking place and transferred into the green-sheet forming tank at a fixed rate at a certain time interval. The rotary distributing mixer will also add muddy water to the green-sheet forming tank to to maintain necessary water proportion in the mix. According to the principle of hydrostatic pressure and filtering a dilute suspension, the material is transferred on the cylindrical presses, one layered upon another. When the desired thickness is reached, the indicator light comes on, the worker uses the automatic cutter to detach the green sheet from the rotating cylinder sieve. The green sheet is then moved to the 1st conveyer belt, finishing the green sheet forming process.


Stage 7: Product forming process

After cutting the green sheet, it will be picked up and transferred into the 2nd conveyer belt. In these two conveyor belts, the green sheet will be cut by by the vertical and horizontal cutter. Once the specified size are achieved, the air-suction forming unit will picked-up and laid down onto the metal mould. At this point, the product forming process is over.


After the wave sheet is formed, it is moved to the steam curing chamber. The boiler will enhance the setting ability of the product. After 2.5 - 3 hours, the product reaches the required hardness and can be demoulded by automate stacker unit.

With only eight above basic stages, the fiber cement corrugated roofing sheet has been produced successfully. However, after that, the sheet should be properly cured to ensure the best quality, curing time should be 14 days before the day of loading.


Recent Posts

See All

622 Comments


elsiebre.we.r1.6.921
6 days ago

bongdanet mình mới ghé thử vì thấy bạn bè hay nhắc, chủ yếu vào xem nó hiển thị dữ liệu kiểu gì thôi. Vừa mở ra là thấy cái bảng livescore chạy theo dạng cột khá dễ nhìn, liếc cái là biết trận nào đang diễn ra và tỷ số hiện tại. Mình thích nhất là cách họ chia thông tin thành từng khối rõ ràng, nên không phải cuộn mỏi tay mới thấy phần mình cần. Lúc bận bận chỉ muốn xem nhanh kết quả hay lịch thi đấu thì vào đây thấy nhẹ nhàng, không bị rối mắt. Với lại có cái dòng thời gian cập nhật (kiểu giờ phút) nhìn khá yên tâm vì biết dữ liệu…

Like

Kabir Singh
Kabir Singh
Jul 20

Paglu Game download was quick and easy. The game offers great entertainment with interesting features and levels. I’ve been playing daily and it keeps getting more engaging every time.


Like

Kabir Singh
Kabir Singh
Jul 20

DG Club login             was quick and easy. The game offers great entertainment with interesting features and levels. I’ve been playing daily and it keeps getting more engaging every time.


Like

Kabir Singh
Kabir Singh
Jul 20

V3 Game login was quick and easy. The game offers great entertainment with interesting features and levels. I’ve been playing daily and it keeps getting more engaging every time.

Like

katrinacha.vez.52.0.2
Jul 19

xosoplus.com dạo này thấy bạn bè nhắc hoài nên mình cũng bấm vào coi thử cho biết. Mình không đọc kỹ nội dung gì nhiều, chủ yếu xem giao diện có dễ dùng không thôi. Cảm giác đầu tiên là trang nhìn khá thoáng, không bị nhồi chữ, nên lướt một vòng cũng đỡ mệt mắt. Mấy mục được chia theo nhóm rõ ràng, kiểu nhìn là biết đang ở phần nào chứ không phải bấm qua bấm lại mới hiểu. Mình hay xem trên điện thoại nên để ý cái menu, thấy đặt khá dễ thấy, chuyển trang cũng nhanh. Với lại cách họ trình bày theo từng khối thông tin gọn gàng, các ô canh hàng thẳng nên…

Like
bottom of page